Operation And Corresponding Adjustment Of Twin Screw Food Extruder

Sep 11, 2020

1. Place the twin-screw food extruder in a ventilated and dry place according to the floor plan.


2. The twin-screw food extruder has a good footing, and other equipment is placed steadily to prevent uneven forces on the body and affect the normal operation of the equipment.


3. All parts of the twin-screw food extruder should be equipped with a knife switch (or air switch), which can be isolated and protected from the mains for maintenance.


Host: BVR10㎜2×3+BVR 4㎜2×1 (The wiring is shown in Figure A2)

All electrical equipment should have reliable grounding or zero protection. The grounding resistance is not more than 4Ω.

4. No-load debugging of the powder mixer: manual cranking, check that the movement system is barrier-free, drive empty test, turn to the arrow direction.

twin screw food extruder

5. No-load debugging of twin screw food extruder


Check whether the electrical components of the host are damaged or loose;

Check whether there is any foreign matter in the main engine barrel, screw and screw barrel, and clean it up;

Check the coordination of the reduction box, screw and barrel, and manually reel the belt (remove the die). The running resistance should be small and uniform. Make a few turns to see if any waste is discharged.

Check whether the feeding screw is smoothly pushed into the barrel;

Install the rotary cutter to the working position, adjust the gap between the blade and the mold, and turn the blade by hand to keep the blade in good contact with the mold at any position, otherwise it should be adjusted.

Check the lubrication system, the connection should be normal, and the oil tank should be sufficient.

6. After finishing the above inspections, turn on the power


Check the lubrication system. Start the "oil pump" start button (green), the oil pump will turn down when there is oil in the spill pipe of the oil pump, otherwise it will reverse. Open the upper cover of the distribution box and the side guard plate of the main engine to adjust the pressure of the pressure regulating valve and the throttle valve, check whether each sliding bearing is oily, whether the thrust bearing lubrication point is normal, and whether the oil return is timely; run for 20 minutes, if the oil level is not Stop rising, then adjust the throttle valve.

Check whether the main motor and the lubricating motor are interlocked properly.

Jog the main motor to check whether the spindle is rotating forward.

Jog the main motor and listen for abnormal noise in the distribution box and screw barrel.

Turn the heating knob to the "ON" position and check the heating system. The normal heating current is 18-19A.

Start the feeding motor, turn the speed control wheel, and check the operation and direction of the feeding screw.

Start the rotary cutting motor and turn the speed control knob to check whether the tool is working properly.

Start the main motor, from low speed to high speed, check whether the motor speed control system is working normally.

7. Other auxiliary equipment of the production line should also have a no-load test run process to check the steering of the motor and whether there is mechanical jamming.


8. Load and debug


(1) After the no-load debugging is normal, install the die head and the die head on the host.


※ The four nuts connecting the die must be fastened, so as not to affect the discharge


(2) Preheating of the main engine: In order to stabilize the temperature in the barrel, a segmented heating method is adopted:


Settings: 30°C in zone I, 100°C in zone II, 120°C in zone III, keep warm for 10 minutes

Settings: 50°C in zone I, 140°C in zone II, 160°C in zone III, heat preservation for 10 minutes

Settings: 50°C in zone I, 160°C in zone II, 180°C in zone III, heat preservation for 5 minutes

(3) While the host is preheating, the powder mixer can be operated to mix powder.


□ Mix powder 50㎏ each time, mix the powder evenly, otherwise the puffing quality will be affected.


(4) After the main engine temperature rises to the set value, start the oil pump and start the main motor after 2 minutes of oil supply. Turn it to 600 rpm (30Hz), add no less than 2000ml of water to the feed port to facilitate discharging. At the same time, start the feeding motor and adjust the handwheel from slow to fast. If the discharging is normal, the main motor speed will gradually increase to 700 rpm (35Hz). The required feeding amount should be based on the principle that it can meet the needs of the host. It cannot accumulate or empty. After feeding, always pay attention to the indication of the main motor ammeter, which is generally controlled at 70-140A.


(5) After the material is extruded normally from the die (no foreign matter, good expansion), start the rotary cutting motor, and then close the rotary cutting machine cover. Adjust the motor speed until the desired length and shape are cut.


(6) Before shutting down, add 1—1.5㎏ about 20% water in raw materials to facilitate cleaning and protection of the host.


(7) When shutting down, stop feeding first. After about 3 minutes, the die will stop discharging. Stop the host. After unloading the die, turn on the main motor and add the puffed waste from the feed port until there is no stickiness at the exit. When the material is shaped, the machine can be shut down, the die head can be cleaned, and the edible oil can be applied and loaded into the host for the next startup.